London
52 Avenue Road
O’Halloran & O’Brien
Clivedale’s redevelopment of 22 Hanover Square comprises 41 apartments, a 51-bedroom Five-Star hotel, a restaurant, and a spa with an indoor swimming pool. The project will be Mayfair’s only fully integrated serviced residential scheme.
This exclusive development includes a three-storey basement which was constructed by Erith Contractors. Premcrete worked closely with Erith to produce a compliant design that complemented the construction methods.

Project Location: | London |
|---|---|
Main Contractor: | Clivedale |
|---|---|
Architect: | Arney Fender Katsalidis |
|---|---|
Structural Engineer: | Ramboll |
|---|---|
Groundworks Contractor: | – |
|---|---|
Type A: | Maxiprufe Plus |
|---|---|
Type B: | Hydrocrete Watertight Concrete |
|---|---|
Type C: | Hydroflow HP Cavity Drain |
|---|---|
Levels below ground: | 3 |
|---|---|
