London

Heathrow Tunnel

Premcrete assisted BAM Nuttall on the Heathrow Tunnel project to undertake refurbishment work on the main and cargo access tunnels to the airport.

2015

The Challenge

Heathrow Airport has awarded BAM Nuttall a contract valued at more than £85m to undertake refurbishment work on the main and cargo access tunnels to the airport.

Part of the refurbishment works was to carry out concrete repairs to the spalled concrete using an R4 Structural Mortar in accordance with BS EN1504.

Premcrete supplied BAM Nuttall with Teknocem S which met the performance specification.

Products Used

Project Details

Project Location:
London
Main Contractor:
BAM Nuttall
Architect:
Structural Engineer:
Groundworks Contractor:
Systems Installed
Type A:
Teknocem S
Type B:
Type C:
Levels below ground:
Share this Case Study

Related Case Studies

Devon
Dawlish Sea Wall
BAM Nuttall
Devon
Dawlish Sea Wall
BAM Nuttall