Liberia

Hydro Power Plant

2013

The Challenge

The Mount Coffee Hydroelectric Power Plant was built in the 1960s, was damaged during Liberia’s civil war and has been unable to generate power since the 1990s. However, in 2015 Dawnus Construction secured the main civil works package valued at £38M which includes the reconstruction and rehabilitation of the main dam, powerhouse, spillway and intake, as well as infrastructure and road works.

Premcrete supplied Dawnus with a number of concrete repair products, floor screeds, epoxy coatings, and waterproofing products. 

Products Used

Project Details

Project Location:
Liberia
Main Contractor:
Dawnus Construction
Architect:
Structural Engineer:
Groundworks Contractor:
Systems Installed
Type A:
Eponite GP, Eponite HB
Type B:
Epocote SF, Preflex 300
Type C:
Premtop 720
Levels below ground:
2