The Mount Coffee Hydroelectric Power Plant was built in the 1960s, was damaged during Liberia’s civil war and has been unable to generate power since the 1990s. However, in 2015 Dawnus Construction secured the main civil works package valued at £38M which includes the reconstruction and rehabilitation of the main dam, powerhouse, spillway and intake, as well as infrastructure and road works.
Premcrete supplied Dawnus with a number of concrete repair products, floor screeds, epoxy coatings, and waterproofing products.
Project Location: | Liberia |
---|---|
Main Contractor: | Dawnus Construction |
---|---|
Architect: | – |
---|---|
Structural Engineer: | – |
---|---|
Groundworks Contractor: | – |
---|---|
Type A: | Eponite GP, Eponite HB |
---|---|
Type B: | Epocote SF, Preflex 300 |
---|---|
Type C: | Premtop 720 |
---|---|
Levels below ground: | 2 |
---|---|