Delta Junction is one of the most complex parts of the HS2 route, where the new high-speed railway weaves through existing infrastructure, rivers, and rural landscapes. The project required the installation of hundreds of precast segments in highly sequenced operations — with minimal tolerance for delay or waste.
The contractor required a segmental bonding adhesive that would:
THE SOLUTION
Premcrete delivered a site-optimised epoxy system and support package tailored to Delta Junction’s unique demands. This included:
Our technical presence and ability to rapidly tailor material solutions helped keep this critical phase of the HS2 infrastructure programme on track, while setting a new standard in segmental bonding performance.