The Challenge

Premcrete were invited to review details for this residential development in London, which comprises a Grade 3 single-storey basement and 2 ground level blocks, requiring a combined system of gas and waterproofing protection.

Based on the GEA Ground Investigation Report, the site was confirmed as a CS2 Gas Risk, and stated that any VOC’s within the ground are below the required protection level. The client was opposed to the idea of wrapping pile caps and large transfer beams above an existing sewer.

The Solution

It was decided that the Premcrete’s 𝐇𝐲𝐝𝐫𝐨𝐩𝐫𝐮𝐟𝐞 𝐋𝐆 was needed. This epoxy-based membrane emerged as a solution, staunchly guarding against the ingress of moisture and gas. Ditching conventional wrapping methods, it streamlined the waterproofing process with efficiency. 𝐂𝐨𝐦𝐛𝐢-𝐒𝐞𝐚𝐥 𝐏𝐥𝐮𝐬 and 𝐇𝐲𝐝𝐫𝐨𝐩𝐫𝐮𝐟𝐞 𝐋𝐆 were also utilised.

The solutions was rigorously tested to replicate a concrete-to-concrete bond, thus eliminating the need for wrapping caps.

Products Used

Project Details

Project Location:
London, UK
Main Contractor:
London Square
Architect:
Allies and Morrison
Structural Engineer:
Waterman Group
Groundworks Contractor:
JRL Group Ltd’s J. Reddington
Systems Installed
Type A:
Combi-Seal Plus, Hydroprufe LG
Type B:
Hydrocrete
Type C:
Levels below ground:
Share this Case Study

Related Case Studies

Teeside
SeAH Wind Monopile, Teeside
K2 Construction Management
Civic Campus Scheme
Ardmore
Whittington Hospital
Bam Construction
Teeside
SeAH Wind Monopile, Teeside
K2 Construction Management
Civic Campus Scheme
Ardmore
Whittington Hospital
Bam Construction
Old Kent Road, London
Malt Street
Berkeley Homes
Canal Side, Westminster, London
Taxi House
McAleer & Rushe
Hackney Wick, London
Wickside
C J O’Shea