Civic Campus Scheme
Ardmore
This facility will be built on the 4.5 million sq ft offshore wind and industrial space, being created on 450 acres of land next to the wharf and heavy-lift South Bank Quay. The first phase of the quay was recently awarded £107 million of funding in the UK Infrastructure Bank’s first ever investment.
Premcrete was delighted to become involved at an early stage to provide waterproofing solutions for this large scale project.
The Challenge:
Equipment pits needed waterproofing within a tight installation program. Project timescales can often require speedy yet effective solutions, of which Premcrete are used to providing.
The Solution:
Premcrete provided watertight concrete, which offered the perfect solution – with its dual crystalline and pore-blocking properties, backed by our 25-year warranty.
This solution did not require additional labour time compared to standard concrete and incurred no additional labour costs.
Key Advantages:
Stakeholders on the Project:
Architect: Corstophine & Wright
Structural Engineer: WSP
Main Contractor: K2 Construction Management
Groundworks Contractor: MGL Group
Project Location: | Teeside |
---|---|
Main Contractor: | K2 Construction Management |
---|---|
Architect: | Corstophine & Wright |
---|---|
Structural Engineer: | WSP |
---|---|
Groundworks Contractor: | MGL Group |
---|---|
Type A: | |
---|---|
Type B: | Hydrocrete, Cemflex VB, Hydrostop BR |
---|---|
Type C: | |
---|---|
Levels below ground: | |
---|---|
© 2023 Premcrete Ltd. | Website by UK Construction Marketing