Turnmills

New life for this iconic, former nightclub in the heart of London.

2012

The Challenge

This former nightclub was demolished to make way for a new 70,000 sq ft office building development. This project required a waterproofing design for the retained basement which could be applied internally, meet the requirements of BS8102:2009 and come with a full warranty.

Premcrete products were able to produce a waterproofing design which met the budget and the stringent requirements of BS8102:2009. Premcrete proposed the use of an internal cavity drainage membrane and a crystalline cementitious coating applied to the retained basement structure. This structural waterproofing system was suited to the project and was flexible in application allowing installation to dovetail with other trades whilst guaranteeing a robust and maintainable waterproofing solution.

Images courtesy of www.turnmillec1.co.uk.

Products Used

Project Details

Project Location:
London
Main Contractor:
McLaren Construction Ltd
Architect:
Structural Engineer:
Groundworks Contractor:
Henry Construction Projects Ltd
Systems Installed
Type A:
Hydrocrete Admixture
Type B:
Type C:
Levels below ground:
2
Share this Case Study

Related Case Studies

Teeside
SeAH Wind Monopile, Teeside
K2 Construction Management
Civic Campus Scheme
Ardmore
Whittington Hospital
Bam Construction
Teeside
SeAH Wind Monopile, Teeside
K2 Construction Management
Civic Campus Scheme
Ardmore
Whittington Hospital
Bam Construction
Old Kent Road, London
Malt Street
Berkeley Homes
Canal Side, Westminster, London
Taxi House
McAleer & Rushe
Hackney Wick, London
Wickside
C J O’Shea