Leeds

Yorkshire Post Site

2019

The Challenge

ISG secured the first phase of the long-awaited redevelopment of the former Yorkshire Post site in Leeds. Fox Lloyd Jones, acting as development manager for YP Real Estate, awarded ISG the landmark multi-million-pound build contract to deliver the first of four phases, comprising 242 apartments, on the 4.6-acre site.

Premcrete supported the construction team to provide a design for the structural waterproofing of the basement which is immediately adjacent to the River Aire. The basement was waterproofed using Maxiprufe 2000 and Hydrocrete Watertight Concrete to provide the required protection.

Products Used

Project Details

Project Location:
Leeds
Main Contractor:
ISG
Architect:
Sheppard Robson
Structural Engineer:
Groundworks Contractor:
Systems Installed
Type A:
Maxiprufe 2000
Type B:
Hydrocrete Watertight Concrete
Type C:
Levels below ground:
Share this Case Study

Related Case Studies

London
52 Avenue Road
O’Halloran & O’Brien
London
Victoria Quarter – Phase 2
Fairview New Homes
Blackhorse Lane
JJ Rhatigan
London
52 Avenue Road
O’Halloran & O’Brien
London
Victoria Quarter – Phase 2
Fairview New Homes
Blackhorse Lane
JJ Rhatigan
London, UK
Television Centre (TVC2)
Multiplex
London
ExCel Exhibition Centre – Phase 3
McLaren
London
54 Bishops Avenue
Erith