North East Lincolnshire
Beacon Academy
Tilbury Douglas

As the longest bridge on the HS2 line, the 3.4km Colne Valley Viaduct spans a series of lakes and rivers, making it one of the most technically ambitious components of the route. With a vast number of precast segments being installed daily, the client required a high-performance epoxy system that could:
THE SOLUTION
Premcrete delivered an engineered epoxy bonding solution, underpinned by constant site presence and tailored technical support. Our solution included:
Our proactive and collaborative approach enabled the Align JV team to maintain a reliable, high-performance segmental bond line — even under tight time constraints and variable field conditions.

Project Location: | London, UK |
|---|---|
Main Contractor: | Align JV (Bouygues Travaux Publics, Sir Robert McAlpine, VolkerFitzpatrick) |
|---|---|
Architect: | HS2 Ltd |
|---|---|
Structural Engineer: | Jacobs/Ingerop |
|---|---|
Groundworks Contractor: | – |
|---|---|
Type A: | |
|---|---|
Type B: | |
|---|---|
Type C: | |
|---|---|
Levels below ground: | |
|---|---|