Points Cross – Phase 2

2024

The Challenge

Delivering 928 affordable homes, the largest development in the Guinness Partnership’s 13-year history, this project connects efficiently to Leeds city centre – helping to create a unique sense of place for those who will live and work in the neighbourhood.

The Challenge: 

  • The basement car park required a Grade 1b waterproof membrane as per NHBC standards.
  • Ensuring a reliable single form of protection whilst dealing with the complex requirements of a large-scale affordable housing project.

The Solution:

  • We utilised Maxiprufe Plus, our self-healing membrane renowned for its lightweight, durable and easy-to-install properties. This provided an ideal solution, offering long-lasting waterproofing and effectively adapting to structural movements.
  • Hydrocrete was also used to enhance the robustness of the waterproofing system, ensuring maximum protection against water ingress.
  • Our solution not only met the stringent NHBC standards, but also facilitated a smoother installation process, saving time and reducing costs.

Products Used

Project Details

Project Location:
Leeds
Main Contractor:
United Living
Architect:
DK Architects
Structural Engineer:
Rosco
Groundworks Contractor:
4D Structures
Systems Installed
Type A:
Maxiprufe Plus
Type B:
Type C:
Levels below ground:
Share this Case Study

Related Case Studies

North East Lincolnshire
Beacon Academy
Tilbury Douglas
London
Belgrove House
Mace
City of London, London
Holborn Viaduct
Multiplex
North East Lincolnshire
Beacon Academy
Tilbury Douglas
London
Belgrove House
Mace
City of London, London
Holborn Viaduct
Multiplex
Delta Junction: HS2 High-Speed Rail Project
Balfour Beatty VINCI JV
London, UK
Colne Valley Viaduct
Align JV (Bouygues Travaux Publics, Sir Robert McAlpine, VolkerFitzpatrick)
London
52 Avenue Road
O’Halloran & O’Brien