London

The Spire

Premcrete were glad to be working directly with the St William division of the Berkeley Group throughout the early stages of the design.

2018

The Challenge

Challenges were faced with an exceptional level of gas risk combined with the need to protect against contaminated ground conditions. Through detailed engagement FIS were glad to introduce industry expertise which helped to rationalise the level of risk across the project, therefore enabling a practicable design solution to be incorporated.

Hydrocrete Watertight Concrete was used throughout the entire substructure, with Combi-Seal Plus being designed to provide combined Gas, VOC and Waterproofing Protection to the Grade 3 zones of the environment and was also adopted for use within the Grade 2 car park to future-proof its use.

Products Used

Project Details

Project Location:
London
Main Contractor:
Greenland
Architect:
HOK Architects
Structural Engineer:
Aecom
Groundworks Contractor:
Systems Installed
Type A:
Type B:
Type C:
Levels below ground:
2 Storeys
Share this Case Study

Related Case Studies

Delta Junction: HS2 High-Speed Rail Project
Balfour Beatty VINCI JV
London, UK
Colne Valley Viaduct
Align JV (Bouygues Travaux Publics, Sir Robert McAlpine, VolkerFitzpatrick)
London
52 Avenue Road
O’Halloran & O’Brien
Delta Junction: HS2 High-Speed Rail Project
Balfour Beatty VINCI JV
London, UK
Colne Valley Viaduct
Align JV (Bouygues Travaux Publics, Sir Robert McAlpine, VolkerFitzpatrick)
London
52 Avenue Road
O’Halloran & O’Brien
London
Victoria Quarter – Phase 2
Fairview New Homes
Blackhorse Lane
JJ Rhatigan
London, UK
Television Centre (TVC2)
Multiplex